Super Yacht Crew
I am lying in my starboard guest cabin after a pretty exhausting week. It started with a Monday night stepping of the rig (finishing at dark 9:30pm) and ended with cleaning the teak until 8:00pm Friday night. We start our work day at 7am and up until this last crazy period of wrapping up we were finishing at 4pm. I decided a 40 hour work week is what life is all about!
For the last week and half since I got back from Mexico I have had a temperature and been really sore. Fever broke last night I woke up drenched in sweat – nice eh!!! Haven’t been sick like that since I can remember last. Last night at 11:30pm the new chef knocked on my door to tell me there was an alarm going off and I had taken Nyquil. Seeing as the varnishers had been in to do the steps up the the pilot house I had to climb out the escape hatch from the crew mess in my PJ’s to get up to the pilot house. Not really a large feat however I don’t know if it is because I am tea total but that nyquil made me feel like I had just been to the knot and shot at KWRW after a large night at the beer tent!
The skipper comes back after 5 1/2 weeks away tomorrow morning at 6:30am and there is a lot to do before we can leave on Tuesday. The bow thruster motor decided to pack it in on Monday so we will most likely have to jury rig it. The hydraulics guy didn’t label the lines right so he has the vang buttons working the halyard tension! Just a few small things that might stop us going sailing! Great project manager I am 🙂 At least the rig is on, the sails are on (mostly), the boat hasn’t sunk at the dock and the white carpets are still white. Looking forward to sailing the Farr 40 in January where there are no bow thruster, furling mains, half halyards with hydraulic rams or lots and lots of teak to clean.