Full service

September 19, 2011   


It wasn’t very nice weather on Monday but I really needed to get the 6 and 12 monthly engine services done so I wrapped up in the beautiful insulated orange boiler suits.


Cleaned foam filter for the turbo


We have to remove the covers off the heat exchangers as the penguin feathers clog them up and remove them with welding rod.


The lovely feathers that clog our engines up.


It takes an awful long time to get 10litres even pre warmed of oil out of each engine using a priming ball from the outboards! First call (November) we are getting a little 12V pump and it will make the job a lot quicker!

Comments are closed.